//// CHALLENGE
As part of Exercise Arrcade Strike, NATO ARRC required a TOP SECRET secure working environment within a disused section of Charing Cross Underground Station.
The facility needed to be rapidly deployed inside an existing underground structure while meeting stringent security standards and an exceptionally tight delivery programme.
First image by UK MOD © Crown copyright 2026.
Second image by Richard Pohle, originally featured in The Guardian.
//// SOLUTION
To achieve TOP SECRET compliance within the existing structure, BeaverFit utilised the NPSA-accredited Bastion Secure Enclosure System to deliver a retrofitted secure working environment.
With just three weeks to procure materials and two days for installation, BeaverFit implemented an accelerated logistics programme supported by off-site manufacturing and pre-assembly to keep the project on schedule.
The underground location required meticulous planning, with materials routed via Imjin Barracks before being transported by rail for installation with minimal disruption.
//// BENEFITS AND FEATURES
- NPSA-accredited secure envelope
- Bastion Multi-Threat Advanced Modular Enclosure
- Intrusion detection
- Integrated access control
- Specialist electrical infrastructure
- Fire-rated construction
- Acoustic protection